Combined Production Order Workflow (MILL_OC) SAP

147
Combined Production Order

Combined Production Order Workflow

Business Process of Order Combination:

In certain segments of industry, including the steel, paper, and textile industries, but also the tools and special-purpose machinery sectors, the same operations are used to manufacture different products. These operations may include producing a melt,continuous casting, and hot and cold rolling. The operations before and after these identical operations are different for different products.

The combined production order function allows you to combine the sequences of identical operations in a consolidated production order in SAP ERP System.

This document shows how two production orders created for the same material are combined. However, there is no system restriction in regard to the combination of production orders with different header material or the mix of MTO and MTS production orders.

Purpose:

  • In this scenario, a combined order is created from two individual orders using the same operations and components.
  • The confirmation and the goods issue are performed against the combined order.
  • The goods receipt is performed against the individual orders.
  • The costs of the combined order are settled to the individual orders

Benefits:

  • Combining machine processes for orders that run at the same time ;ie Reduction in setup time
  • Settling the costs to the individual orders.

Prerequisites:

  • SAP ECC 6.0
  • Industry Solution ECC-DIMP to be activated in SFW5

Configuration:

SPRO >> Production >> Shop floor control >> Master data >> Order >> Administer selection profile for the combination.

Create the selection profile as displayed below:

Process WorkFlow:

  • Creation of two original production orders for finished products (CO01)
  • Combination of the two original production orders into one combined order (MILL_OC)
  • Post good issue against the combined order (MIGO)
  • Confirmation of the combined order (CO11N)
  • Post the goods receipt against individual orders.(MB31)
  • Technical completion of combined order.
  • Cost settlement of the combined order to the original orders

Process Flow with screen shots:

There are two scenarios handled in combination order process.

  1. Combination of production orders belonging to same material derived from single sales order.
  2. Combination of production orders belonging to same material derived from two different sales orders.
  1. Creation of Production Orders: ( Tcode: CO01/CO41)
  • List of production orders created against sales order A
  • List of production orders created against sales order B
  1. Combination of Original production orders into combined order ( Tcode : MILL_OC)

In standard MILL_OC is the tcode used for combining the production orders. More than two production orders also can be combined. Select the plant, selection profile and order numbers which needs to be combined as shown below.

Various options are available like imputing sales order number or material number or production order numbers. In the below example production orders numbers which needs to be combined are entered.

Select the orders to be combined along with one order as reference order as shown below. Click on Execute button.

New Pop screen will be displayed as shown below. Click OK.

New combined production order (A) is created for qty of 20 by combining the original order 1 (A1 – qty 15) and original order 2 (A2 – qty 10) as displayed below. Release the order and SAVE.

Observe the routing of one of the original order A2

Combination order A has same operations as original orders including the standard values like setup time, machine time etc.

Observe the BOM of the combined production order. Two negative elements are created automatically for two original orders combined.

  1. Goods issue against combined production order ( Tcode : MIGO)

Good Issue to the combination order –Tcode MIGO

Material cost for the combination order.

  1. Confirmation against combined production order: (Tcode : CO11N)

Go to T-code CO11N and confirm the operations of combination order

Confirmation of first operation 0010

  1. Goods Receipt against Original Orders: (Auto GR -CO11N or MB31)

Auto GR while doing confirmation of last operation is possible.

While confirming the last operation for combined production order, click on the Quantity Distribution button as shown below to distribute the total GR quantity to original orders

Below screen will appear, showing the confirmation quantity against the individual order. Click on execute or press F8.